These assembly instructions are for building
a Post & Beam pergola with its posts set in concrete.
| Tools & Materials Needed |
Hardware included w/ the pergola |
- marking tape or string
- two or three 25-ft measuring tapes
- one framing square
- one or two power screw drivers
- a 12x12 or larger moving blanket (to protect the
cedar from ground
scratches
- two rubber mallets
- a 4-inch x 4-inch wood block
- an appropriate length light-duty extension cord
- two 6-8 ft. ladders
- 8” inch diameter Sono tubing
- concrete mix
|
- Wooden plugs
- Tite Bond glue (for wooden plugs)
- 2.5-inch screws with square heads
- 3-inch screws with square heads
- one long square bit
|
Please note that these instructions correspond
with the site plan, which is packed with the assembly hardware
in the shipping crate.
STEP 1: PREPARING POST HOLES
STEP 2: DETERMINE THE HEIGHT OF THE
PERGOLA
STEP 3: BUILD THE LEG ASSEMBLIES
STEP 4: LEVEL THE PERGOLA
STEP 5: INSTALL THE RAFTERS AND PURLINS
Call Jason Shiers or Max Baldwin at 1-800-344-5103
with any questions or problems.